Brief Introduction
MRac Carport is specially designed to fit specific requirements for different installation area with a quick and easy installation. We take great pride in our products and continually seek out the best quality at the most competitive price. Covered by the carport, the MRac Carport solution will not only generate clean energy but also offer comfortable shading for your cars in sunny days.
Technical Parameter
Installation Site: | Ground |
Foundation | Driven pile, ground screw, concrete bases |
Installation Angle | 10-60° |
Wind Load | 60m/s |
Snow Load | 1.6KN/m2 |
PV Modules | Framed, unframed |
Module Orientation | Portrait or landscape |
Standards | AS/NZS 1170 |
DIN 1055 | |
JIS C 8955:2011 | |
International Building Code IBC 2009 | |
California Building Code CBC 2010 | |
Profile Materials | Al6005-T5(Anodized) |
Q235B(Hot-Dip Galvanized) | |
Fasten Parts | Steel(Darot) |
Small Components | Al6005-T5(Anodized) |
Color | Silvery or according to customer requirements |
Warranty | 10 years |
Advantages
Easy Installation: The utilized and economical design of MRac Carport solution making it time and cost effective.
Versatile Application: Can be installed on various carport or canopy facilities, highly customized.
Good Compatibility: System is compatible with most of the major framed and frame-less PV panels in the market, align panels for optimization.
High Quality: Optimized profile geometries designing; Strict QC controlled production; Supreme corrosion resistance ability.
10-Year Guarantee: Strict quality control over materials and finished products.
Product Structure Diagram
Components List
![]() | ![]() | ![]() | ![]() |
End Clamp Kit | Inter Clamp Kit | C Clamp Kit | Rail 45 |
![]() | ![]() | ![]() | ![]() |
Rail 45 Splice | Girder | Beam Connector | Beam |
![]() | ![]() | ![]() | ![]() |
Adjustable Tube Connector | Adjustive Pole | Splice for Post | Quadrate Post |
Installation Instruction
Install PR-6Quadrate Post. Embed the Quadrate Post into the groove of the flange.
Install Splices for Post
Put the Girder between the two Post Splices, fix it with M14*150 Hexagon Bolts as planned.Then install adjustive Pole.
Connect the Beam with Built-in Fitment by two sets of Hexagonal Bolt M12*90.
Install the Rail
Install Solar Panels
The installation is complete.
Reference Projects
Workshop
Carbon steel factory owns 15 steel rolling production lines, and 4 solar stent aluminum production lines.
Installation Guide
MRac Installation Guideline for PR6 System.pdf
MRac Installation Guideline for PR6 System(with Ground Screw).pdf