Brief Introduction
MRac Ground Terrace III(GT III) is a ground solar PV mounting system developed from GT II. GT III has higher wind and snow resistance and optimized structural design, while it is also going to be pre-assembled before shipping, all of which facilitate faster and cost-effective instalation. GT III is ideal for middle-large solar projects which have higher requirements for corrosion resistance and structural strength.
Technical Parameters
Installation Site | Open terrain – ground mount |
Foundation | Concrete bases,Ground screws |
Installation Angle | 5-60° |
Wind Load | 80m/s |
Snow Load | 1.6KN/m2 |
PV Modules | Framed, unframed |
Module Orientation | Portrait or landscape |
Standards | AS/NZS 1170 |
DIN 1055 | |
JIS C 8955:2011 | |
International Building Code IBC 2009 | |
California Building Code CBC 2010 | |
Profile Materials | Al6005-T5(Anodized) |
Fasten Parts | SUS304 |
Small Components | Al6005-T5(Anodized) |
Color | Silvery or according to customer requirements |
Warranty | 10 years |
Advantages
Can quickly assemble with minimal components while maintain a strong structure, highly pre-assembled design minimizes labor cost, and don't need onsite cutting or drilling in our beams or rails.
Flexible module layout, can be applied to both vertical and landscape.
Strict QC over all component and finished products ensure the reliability and strength with a longer service life.
The compact structural design ensures the reasonable utlization of the space of containers.
Product Structure Diagram
Components List
![]() | ![]() | ![]() | ![]() |
Wide End Clamp Kit | U27 Inter Clamp Kit | C Clamp Kit | Beam |
![]() | ![]() | ![]() | ![]() |
Splice for Beam | GT3 Pre-Assembled Supports A | GT3 Pre-Assembled Supports B | GT3 Anchor Plate Kit |
![]() | ![]() | ||
Angle aluminum | Ground Screw |
Installation Giude
Locate the proper position for piling by wooden stakes.
Remove the stakes at the positions and pile Ground Screw.
Install GT3 Anchor Plates
Install GT3 Pre-Assembled Supports
Install Rails
Installation the panels
The installation is complete.
Reference Projects
Workshop
Carbon steel factory owns 15 steel rolling production lines, and 4 solar stent aluminum production lines.
Installation Guide
MRac Installation Guideline for Ground Terrace Ⅲ.pdf